Finally Our POOJA SF is back with LHB and has been recovered from derailment incident...!!!!
Today as 12414/3 was cancelled between AII-JP...hence around 17.00 in the evening....ICF POOJA(12414) arrived at PF2 and LHB POOJA(12413) with S1,S2,S9 (New LHB coaches sent by NR with 12986 yesterday) was shunted at PF1 from AII side...Whole rake was same...just these coaches were replaced by new ones....:)
And finally departed at 17.15 from PF1...TBs were only placed at S3-S8 and Rear EOG...So now BOTH RAKES ARE running with LHB coaches and NWR ICF Rake is back with NWR...
more... now.....Awsm work done by NWR....Hats off...:)
.
JP was crowded with DLI/JU Passengers...and VSKP-BGKT was overloaded by JU pass..as single train for them today...
.
Inputs by : Member# 857172~ Anna