Only the labours and contractors will be able to catch the passenger or express train as they will be dismissed at 5 PM. We won't be able to catch any of them in time. All ours work at IPTN will finish at around 6-7 PM. No rail car is available to take us to BKSC because DRM will have it for inspections at Burnpur. Travelling to Naya More will take 15 mins. and station more 15 mins at least. Roadway is the only option for us. ЁЯШТ