UDZ-AII Electrification :- During last week I travelled in 09722 UDZ-JP Holiday SF, but train was about 2 hrs late, that's why I got some time to click pics about progress of electrification, Below are some pics with detailed information -
Pic No.1-2 :- OHE van standing on platform no.2.
Pic No.3-5 :- Wiring work has been completed on platform no.1&2.
Pic No.6...
more... :- Wiring work pending on platform no. 5 & loop lines.
Pic No.7-9 :- The Maharaja Express standing on platform no.3.
Pic No.10-12 :- Train No. 19666 UDZ-KURJ express on loop line near platform no.5.
Pic No.13-15 :- Mewar Express standing on platform no.4.
Pic No.16-21 :- Platform shade has to be changed & material has been laid down on platform no. 2-3.
Pic No. 22-23 :- Maintainance is going on of train no.12996 UDZ-BDTS SF & Chetak Express is standing on side line.
Pic No. 24-27 :- Pics taken from old foot over bridge near Ahmedabad line.
Pic No. 28-29 :- Finally train no. 09721 arrived on platform no.1.
Pic No. 30-32 :- 2 additional coaches were detached by loco WDG4D 70442 & 1 utkrisht coach was added by WDG4 12559.
Pic No. 33 :- Overhead mast was going to be fixed by service crane near Ahmedabad line.
In the next post I will upload pics of Berach - Chanderiya - Chittaurgarh electrification...
Thank you.