Wondering how the route for 11013-11014 will be if shifted.....As of now it comes from HSRA, then moves to BYPL, Cantonment and then SBC. after that rake reversal and then same route then moves to Channasandra towards Yelahanka. With the new terminal, not sure if there will be engine change etc.
But surely can save easily 1.5-2 hrs running time