Almost 4 months for this schedule to take effect. The future departure timings of Ajanta at Mudkhed will be 12:10AM and the current departure timings of Krishna from Mudkhed is 12:05AM. I believe they'll alter the timings of Krishna. Because both trains can't arrive NZB at 01:55AM.. Am I right ?