speed up in NDAE-KWAE by 15 mins, NXL-KNHR part by 3 mins, KNHR-LBP by 2 mins, LBP-AMP by 1 mins, 20 mins for Reversal at SNT & speed up 5 mins in SNT-SURI part. make TT like this:- NDAE 11.16/18; KWAE 11.58/12.03;
NXL 12.23/24; KNHR 12.39/40; LBP 12.52/53; AMP 13.07/09; SNT 13.23/43;
SURI 14.05| 229 kms| 4 hrs 45 mins| 46 kph| M/E| ER.