But in Karnataka more than 90% of the routes are getting electrified only because of Modi Government as Late Anant Kumar (EX MP B'lore South) was the close friend of Ex RM Suresh Prabhu he pressurized a lot and got sanctioned for electrification of all routes in Karnataka otherwise at present even SBC MYS section wouldn't have been electrified if we were depended on RB. Even KJM DLS is been upgraded to ELS because of PC Mohan who insisted to setup an ELS at Banaswadi but it will be at KJM and BAND will be a MEMU shed. And now if KLBG comes under SWR then 95% of thr requirements of Karnataka regarding rail infrastructure will be fulfilled. MoSR also pressurised officials to upgrade tracks in SBC UBL section and run trains at 130 kmph by 2022 after completion of doubling and electrification.