"PCEE Inspection Speed Trial" ahead of CRS Inspection on newly constructed 4th line between Dankuni & Baruipara stations of Howrah Barddhaman Chord Line.
Video click here
ЁЯФ╣Power Nominated - HWH WAP5 30122
ЁЯФ╣Date - 18.12.19
ЁЯФ╣Actual...
more... timings & speed "at stations" -
Dankuni.............d.13:34:58 0 kmph
Gobra.................p.13:36:28 130kmph
Janai Road........p.13:42:58 15 kmph
Begumpur..........p.13:48:55 85 kmph
Baruipara...........a.13:54:10 0 kmph
ЁЯФ╣Highest speed achieved - 142kmph
ЁЯФ╣ Physical condition of 4th line
Track fitness - Granted
OHE fitness - Granted
Signal - Not functional
Turnout with M/Line (Up HBC Line) - available at Baruipara
ЁЯФ╣TI (M)/HBC & Sr.Supervisors of all relevant deptts. were accompanying the trial loco.
ЁЯФ╣Details of pictures
Pic 1-4 = at Gobra & Janai Rd. showing actual trial
Pic 5-6 = Notice of trial
Pic 7-10 = Primary track testing at Janai Rd. & Baruipara
ЁЯФ╣Status/Result of trial - Successful
please wait...Translate to EnglishHey, there was a speed trial inspection done on the newly constructed 4th line between Dankuni and Baruipara stations of the Howrah Barddhaman Chord Line. You can check out the video by clicking on this link - https://youtu.be/8-HLgJF4WwU. They used HWH WAP5 30122 as the nominated power and the highest speed they achieved was 142kmph. The physical condition of the 4th line was granted for both the track and OHE fitness, but the signal was not functional. The turnout with M/Line (Up HBC Line) was available at Baruipara, and the trial loco was accompanied by TI (M)/HBC & Sr.Supervisors of all relevant departments.
Pic 1-4 are shown at Gobra & Janai Rd., demonstrating the actual trial.