Mangalore Bangalore HMRDA block can be removed if railway wishes to do. All 3 Bangalore Bombay trains were extended/ handed over to other zones. Now, why can't SWR run a proper Bangalore Mumbai trai What is the use of doubling, electrification, new lines etc when it takes 24 hours to travel between Bangalore and Mumbai?
If there is a will there are many ways.