Special blog related to the total kms of the Hubballi division of SWR with its route details.
Hubballi Division (Headquarters of SWR)
1. Ballari - Hubballi section :
тнРDistance 208 kms.
тнРMps 105...
more... kmph.
тнРRoute Under electrification targetted of completion - beginning of 2021.
тнР Fastest train 18047 Amaravati Express takes 3.30 hrs at an average of around 60 kmph.
2. Hubballi - Vasco section :
тнРDistance 199 kms
тнРMps 90-100 kmph
тнРRoute under electrification targetted of completion upto Londa end of 2020
тнРFastest train 17311 Chennai Vasco Express takes 6 hrs 5 mins at an average of 33 kmph.
3. Gadag - Hotgi section :
тнР Distance 286 kms
тнР Mps 75-100 kmph in different stretches
тнР Route under electrification targetted of completion march 2021
тнР Fastest train 17319 Secunderabad Express takes 6.15 hrs at an average of 46 kmph
4. Kotturu - Hosapete section :
тнР Distance 72 kms
тнР Mps dont know exactly
тнР Single diesel line and fastest train is Vijayapura Express
5. Kadiridevarapalli - Rayadurg Section
тнР Distance 64 kms and only one passenger train runs
6. Rayadurg - Ballari section
тнР Distance 54 kms and fastest train is 56909 HPT Passenger.
7. Vyasa Colony - Swamihalli section of 43 kms distance and only freights run in this section
7. Ginigera Raichur section not included as its under construction operational upto GGVT 39 kms from ginigera and 1 pass and 1 Express trains run in this section.
8. Alnawar Ambewadi section : 26 kms and mps is 50 kmph. 2 passenger trains one from UBL and one from Dharwad goes to Ambewadi.
9. Londa Miraj section :
тнР Distance 189 kms
тнР Mps 105 kmph only between Belagavi to Miraj
тнР Under electrification targetted of completion mid or end of 2021
тнР Fastest train 12779 Goa Express
тнРToranagallu - Ranajitpura 23 kms only used by freights
Total route kms of Hubballi Division : 1202 kms
Ballari - Hubballi section is the fastest route of Hubballi division with mps of 105 kmph (dont have official info was mentioned here based on speedometer readings).
In this section 932 kms of route is under electrification