After electrification on Malda to Kiul railway line, it has now been targeted to increase the speed from 110 to 130. For this, the Malda administration has decided to repair the rails in the month of August and repair the dilapidated bridge-culvert. The bridge-culvert age of this railway block built in the British era has crossed almost 100. Due to the dilapidated bridge-culvert, the cushion has been planted here. At the same time, stoppage is also provided at the place. A senior official of Malda division department said that now the stoppage of most of the long distance trains will not be provided at small stations. A total of 54 kilometers have been laid from Jamalpur to Bhagalpur railway line. Generally, the age of the tracks is 100. In particular, the tracks of Jamalpur, Bariakol Tunnel, Ratanpur, Bariarpur, Kalyanpur, Gangnia and Sultanganj are included.