It wouldn't make sense to have specially modified rakes for long distance trains to run to Srinagar, when they only need the modifications for the Katra-Srinagar portion of the run (for SL/UR). It would be an unnecessary expenditure, if trains like Himsagar are extended.
Better to arrange connecting trains from Jammu.