Please re-check TT
1. Its way fast on the MRJ-UBL stretch (Your train takes 4 h 40 mins) whereas the fastest train currently takes 5 h 25 mins)
2. Clashes with the TT...
more... of Siddhaganga Exp which is daily train on the UBL -ASK leg of the journey (practically not possible to run a train with a gap of 5 mins on a single diesel track without automatic signalling)
3. Clashes with TT of Talguppa Mysore passenger between ASK-HAS-MYS / Minimum of 2 h 45 mins required on the HAS-MYS stretch considering that there is traffic on the route and its day time.