Good news !
M/s Kalpataru Power
Transmission Ltd has won the 625cr contract for electrification of Manmad-Dhone section of Hyderabad Division of South
Central Railways.
i)This includes the Jankampet - Bodhan
branch....
more...
ii) Excludes the
Manoharabad-Umdanagar Hyderabad suburban section that has already been electrified.
iii) The entire 1046 km track will be electrified by April 30th, 2023. With this, all mainline sections of South Central Railways will be electrified for seamless North - South connectivity...!