On Trip
Late: 7m late
YT/Yevat 3.4 km<--->2.9 km KTT/Khutbav
Speed: 94 km/h
Crossed YT
Posted thru
Follow my TripOn Trip
Late: 6m late
YT/Yevat 4.4 km<--->2.0 km KTT/Khutbav
Speed: 93 km/h
27 km to DDCC
Posted thru
Follow my TripOn Trip
Late: 2m late
PAA/Patas 3.5 km<--->5.0 km DDAP/Daund Patas Road Cabin
Speed: 93 km/h
Approaching DDCC
Posted thru
Follow my TripOn Trip
Late: 4m late
@ DDAP/Daund Patas Road Cabin
Speed: 4 km/h
Arrived at Daund Chord Line
Posted thru
Follow my Trip