it is EOG , HCPV bich me isiliye lagaya hai kyuki kuch HCPVs me jo hog cable connect hota hai EOG and loco me uske liye arrangement nahi tha isiliye fir kuch trains me shunt karke piche lagate the but ab second last position me laga dete hai
Posted thru
Follow my Trip