Pic 3: Bypore Mail: 1863-64 Through as GDs, Sep 1865 No Mail Allowance from Bombay/Beypore till Line completes, 1867-68-69 Ord/Mail (2 trains to Beypore) , 1870 MAS/SBC/RC-CBE Night + PDJ-Beypore Morning Mail, Jan 1880 PDJ-Byepore Mail Discontinued (MAS Through Coach demolished), 1880-81 PDJ-Beypore Ord demolished (PDJ-Beypore left with no Train)
Pic 1: 1875-76: No through Mail to Beypore, Pic 2: 1889: Through Mail to Calicut, click here 5 March 1888: MAS-CLT Connected with Ferry near CLT, 1890 Through Connection to CLT (Through Mail started at 18:00 ex MAS, Become Malabar Exp with SRR-ERS Link for MAS & MAQ)
1...
more... July 1940: Cochin-SRR BG, Malabar Exp diverted to Cochin, Malabar Exp MAS-CBE Slot taken by MAS-Cochin Exp (Extension of MAS-CBE Island Express), Mangalore Express (New Train) started in MAS-MAQ which become 1 MAQ Mail!!