Energisation (Charging) of electrical Over Head Equipment (OHE) in Priority Section of Delhi-Ghaziabad-Meerut
#RRTS corridor will begin in October. OHE being installed above RRTS track will be energized with 25000 volts. Installation of OHE is progressing at pace.