CKP-Goilkera 3rd line gets 2.2 crores.. but I think its complete.. except CKP Station portion.. which from long time we are hearing that the line will loop outside the main station building, making it sland.. so finally is it for the same?
Chandil-Burnpur 3rd line gets 40 crores is good.