Came to Bengal after an year from Bangalore by 22864. From HWH we didn't board 37841 and chose to board 37843 after 20 mins.
Both the trains reached BDC at same time. I thought they both will run parallel using the 3rd line. But 37843 had to wait a bit to start even after the scheduled departure time.
What's the status of 3rd line ? I still see trains are changing track only at KHN. However work is almost done till ADST, isn't it ?