sach me jagah n hai :D
18623 ka ye haal hai subah subah Ranchi / Hatia pahuchne par.
Ek parcel van / SLR kyun n lga leta hai SER :D :D
To...
more... carry the Linens for 20801, 20802, 18624. :)
For one leg of journey, They need minimum 700 blankets, 700 pillows, 700 pillow covers, 1400 bedsheets, 700 towels and 700 brown paper bags :D
And if the multiple halt tickets are sold, then the situation will become difficult for SER.
Ideally SER shall raise their hands and ask railway board to remove this RSA.
This train has LHB rakes now, can be upgraded to 130 MPS and can be transferred to NR once again. Anyhow, they have the turn around time of 9 hours at NDLS.
20802 can be speeded up, 20801 can start late still reach NDLS at its present time. That will be enough TAT for Magadh at IPR.