Aunrihar to Sadat doubling almost completed
Dont know NI work block has been taken or not ..
But i guess in Q1 of 2023 the section will be double electrified..
Similarly Indara to Kiriharpur will be double by same time period and Indara to Dohrighat Gauge Conversion..
However...
more... benefits of doubling will be currently from Indara to Kiriharpur one as sometimes in morning and evening train has to stop at outer and one station before for crossing..
Witnessed the same at 29 nov at Indara when 3 trains approaching IAA
1. Gkp ICE (held at outer)
2. Krishak (coming on down mainline from Mau)
3. Bui-shg passenger (held at outer)
Firstly shg pax taken on pf and then krishak came, shg pax was depart from opposite mainline as it will go towards AMH side
And GKP ICE was still at outer as Krishak was at IAA
When line clears gkp ice was taken at pf and krishak was departed
This whole thing took place in 35 minutes as we were stopped at Level Crossing...
I hope by 2024 maximum route will be double in patches ✌️