With the ongoing election heat and extension trend in telangana..
I feel that this train will be extended to gajwel Or siddipet if construction reaches siddipet in next 6 months..
Later it might be extended to karimnagar.
Then it will become train link from tirupati to Vemulawada temples
please wait...Translate to EnglishYo, with all this election hype and the ongoing extension scene in Telangana... I got a hunch that this train is gonna be stretched to Gajwel or Siddipet if they finish building in Siddipet within the next 6 months. And later on, it might even go all the way to Karimnagar. That would make it a badass train link from Tirupati to Vemulawada temples, man.