Heard from some source that this train was introduced without even checking or consulting with SR TVC div. ERS doesn't have any slot and space for stabling and maintenance in pit line. There were few other trains already scheduled for maintenance. Also Sabarimala spl were there. Train came till ERS. Then the empty rake was sent back to CBE. Return journey starts from CBE.