Statutory inspection of RE works in Bikaner East-Bikaner (8RKM/11TKM) single line section of Bikaner Div. of NWR completed successfully. With this, CORE achieves 3378.69RKM/4727.88TKM in FY 22-23
#Electrification
please wait...Translate to EnglishThe check-up of RE works in Bikaner East-Bikaner single line section is done! CORE has now covered 3378.69RKM/4727.88TKM in FY 22-23. #Electrification
please wait...Translate to HindiRKM/TKM se jo RE ka kaam tha woh Bikaner East-Bikaner (8RKM/11TKM) single line section mein puri tarah se ho gaya hai. Ab tak CORE ne FY 22-23 mein 3378.69RKM/4727.88TKM tak ka lakshya poora kiya hai. #Electrification ke liye
yahan dekhe