There has been so many feedbacks given to SCR by many railfans and passengers regarding either cancellation of RSA or changing the timings for Ajanta and speed up of the train. Every time they are replying with same answer that they are seriously considering it and informing the relevant authorities, but still no results seen until now.
The PM of around 8hrs and 7hrs is not sufficient for a long distance train. Even though sometimes it is reaching on time or late by around 15 mins, it's still getting rescheduled which...
more... should not be the case. Also, the TOT in HWH and MMR is around 15 hrs and 13 hrs respectively which is way more than required, so they can either change the PM to other zone or change the timings. For Falcon, it may be difficult as a new path should be allotted by 3 zones but the same is not the case for Ajanta as it's whole route is in SCR except it's destination.
please wait...Translate to EnglishThere have been a lot of feedbacks given to SCR by many railfans and passengers about canceling RSA or changing the timings for Ajanta and speeding up the train. Every time they give the same answer that they are seriously considering it and informing the relevant authorities, but still no results are seen until now.
The Prime Minister (PM) of around 8 hours and 7 hours is not enough for a long distance train. Even though sometimes it reaches on time or is late by around 15 minutes, it still gets rescheduled, which shouldn't happen. Also, the TOT (Time on Train) in HWH and MMR is about 15 hours and 13 hours respectively, which is way more than necessary. So they can either change the PM to another zone or change the timings. It may be difficult for Falcon as a new path should be allotted by 3 zones, but the same is not the case for Ajanta as its whole route is in SCR except for its destination.