Since Dhanbad will be crew change point keep it as a 5 min halt, BKSC and ASN should have a 3 min halt, DGR 2 min halt
BKSC-DHN should take 1 hrs 15 mins to 1hrs 20 mins due to the fire infested DC line
Between...
more... DHN and HWH Keep average speeds around 90...
16 Coached VB not needed keep it limited to 8 coaches....