It has now become important for IR to introduce a faster parallel connectivity between Ndls and Ljn as Shatabdi has become really very slow and behaving like a passenger.
The train is not able to cover Delhi Lko distance in even 7 hours. a train which use to cover the same distance in 6 hours 15 mins at the time of its introduction.. 30 years ago..
IR is traveling back in the time...