This train is the role model for red tape and wastage of assets in IR.Using 2 Dedicated LHB rakes for just 394 kms with no RSA.A passenger turned into a Jan Shatabdi which no one asked for.So much for hypocrisy NR to free PF and ruining intercity trains using RSA this occupies space at both points while NR keeps rejecting trains giving lecture about congestion