CR lab in Wadi Bunder to repair, maintain Vande Bharat trainsThe Central Railway in Mumbai is establishing an electronics lab at Wadi Bundar to repair and maintain electronic components in Vande Bharat coaches, aiming to save ₹70-75 lakh annually. The lab will handle repairs for emergency and regulated battery chargers, along with ensuring the functionality of microprocessors, power cars, and water...
more... level indicator systems. The lab is part of the revival of the Wadi Bundar coaching depot, which was built in 1882 and is now being equipped with eight pit lines at a cost of ₹54 crore to house and maintain Vande Bharat trains. The depot houses trains running to Shirdi, Solapur, and Goa.
Mumbai me Central Railway, Wadi Bundar me ek electronics lab banara hai, jahan Vande Bharat coaches ke electronic components ko repair aur maintain kiya jaayega. Isse railway ko saal me ₹70-75 lakh ki bachat hone ki ummeed hai. Lab emergency battery chargers, regulated battery chargers aur other electronic equipment ko repair...
more... karega, aur yeh bhi ensure karega ki microprocessors, power cars, aur train coaches me water level indicator systems sahi se kaam kar rahe hain.