Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 23 04:06:18 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5915822
Posted: Dec 19 2023 (11:08)

No Responses Yet
Rail News
3231 views
0

New Facilities/Technology
Dec 19 2023 (11:08)   Namo Bharat Train Trial Runs to Start on Entire Ghaziabad-Meerut RRTS Stretch in January 2024

guest   134 news posts
Entry# 5915822         Tags   Past Edits
RRTS project: Track laying over, trial runs to extend to full 25km next month

The National Capital Region Transport Corporation (NCRTC) announced that trial runs for the Namo Bharat trains on the 82km Regional Rapid Transit System (RRTS) between Ghaziabad's Duhai and Meerut (South) will likely begin in January 2024. The track laying for the 25km section has been completed, and the installation of signals...
more...
and overhead equipment will soon be finished. Trial runs currently underway between Duhai and Modinagar (South) are expected to extend to Meerut (South) in January. The project is expected to be fully operational by June 2025, connecting Delhi, Ghaziabad, and Meerut. The 25km section, with four new stations, is expected to be operational by March 2024. The 17km section inaugurated on October 20, 2023, has five stations. Once the 25km section is operational, passenger operations will extend to all eight stations in Ghaziabad. After the 25km section opens, the focus will shift to opening the RRTS stretch in Delhi and then the Meerut (South) to Modipuram section.

National Capital Region Transport Corporation (NCRTC) ne bataya hai ki 82km long Regional Rapid Transit System (RRTS) pe Ghaziabad ke Duhai se Meerut (South) tak Namo Bharat trains ke trial runs January 2024 mein shuru ho jaayenge. 25km section pe track laying complete ho chuka hai, aur signals aur over-head equipment...
more...
ki installation jaldi hi khatam ho jaayegi. December 10 se Duhai aur Modinagar (South) ke beech chal rahe trial runs January mein Meerut (South) tak badh jaayenge. Project June 2025 tak fully operational ho jaane ki ummeed hai, jo Delhi, Ghaziabad aur Meerut ko connect karega. 25km section, jismein four new stations hain, March 2024 tak operational ho jaane ki ummeed hai. 17km section, jo 20 October 2023 ko inaugurate kiya gaya tha, mein five stations hain. 25km section operational hone ke baad, passenger operations Ghaziabad ke saare aath stations tak badh jaayenge. 25km section open hone ke baad, focus Delhi mein RRTS stretch aur phir Meerut (South) se Modipuram section ko open karne pe hoga.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4948161 ★★★ 45SCoR~
6130751  10Rail_0326~
5092410 ★★★ 69jishnuthakur12301^...
1959644 ★★★ 271Arpit~
5650504 ★★★ 107jishnuthakur12301^...
4312546 ★★★ 282jishnuthakur12301^...
5341825 ★★ 24SreeNdl^~
5595577 ★★★ 32RoyalIndianRailway...
6191858 ★★ 25SreeNdl^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy