Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Oct 6 08:12:34 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5919813
Posted: Dec 22 2023 (21:43)

No Responses Yet
Rail News
3097 views
0

IR Affairs
Dec 22 2023 (21:43)   Shravasti Rail Line Phase 2 Construction Begins in New Year

Exynos9611~   20891 news posts
Entry# 5919813         Tags   Past Edits
Shravasti News: खलीलाबाद-श्रावस्ती-बलरामपुर नई रेल लाइन को विशेष प्रोजेक्ट का दर्जा

The construction of the second phase of the Khalilabad-Bahraich via Shravasti rail line is scheduled to begin in the new year. The first phase involves land acquisition. The government has declared this phase as a special project, ensuring sufficient funding. The entire project is divided into two phases. The first phase,...
more...
covering Khalilabad to Bansi, has almost completed land acquisition. Work on stone blasting and earthwork is ongoing on the Bansi-Khesarha route for approximately 10 kilometers. The agency responsible for the project claims to complete these 10 kilometers within four months. The second phase, starting from Bansi to Bahraich, has been categorized as a special project by the Indian government and is scheduled to commence in February. This phase will involve land acquisition as well. The new rail route will include 16 stations and 12 halts. Additionally, two bridges will be constructed over the Rapti River in Shravasti.

Khalilabad se Bahraich tak Shravasti wali rail line ka phase 2 new year mein start hoga. Pehle phase mein land acquisition hoga. Sarkar ne ise special project declare kiya hai, toh budget mein koi problem nahi aayega. Pura project do phase mein complete hoga. Pehle phase mein Khalilabad se Bansi tak...
more...
ka kaam almost complete ho chuka hai. Bansi-Khesarha route pe 10 kilometer tak stone blasting aur earthwork chal raha hai. Project agency ka claim hai ki yeh 10 kilometer 4 months mein complete ho jaayega. Phase 2 mein Bansi se Bahraich tak rail line ka kaam hoga. India government ne ise special project declare kiya hai, aur yeh February se start hoga. Is phase mein bhi land acquisition hoga. Is new rail route pe 16 stations aur 12 halts banenge. Shravasti mein Rapti river pe 2 bridges bhi banenge.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

1910443 ★★★ 142Praveen~
4312546 ★★★ 287jishnuthakur12301^...
3247625 ★★★ 135~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy