आरओबी निर्माण के चलते दो से तीन घंटे बंद रहता है रेलवे फाटकIn Santnagar, the railway gate on Fatak Road is being closed for extended periods, sometimes for two to three hours at a time, due to the ongoing construction of a railway overbridge and a third railway line. The exact time of closure and duration are unpredictable.
Santnagar ke Fatak Road pe, railway gate kab band hoga aur kitni der band rahega, koi nahin jaanta. Railway over bridge banne aur teesri railway line ke chalte, in dinon ek baar mein do-teen ghante tak ek baar mein gate band kiya ja raha hai.