Vande Bharat or Amrit Bharat? What do you prefer along with Pamban Bridge opening ceremony and MDU-BNC VB?
I Prefer, 1. RMM-SVDK SF via Mainline, TNM, TPTY, NDLS as these imp pilgrimages lack Capital connectivity.
2.RMM-CSMT/LTT TOD via Same Mainline, TNM, TPTY.
3.MAQ-RMM SF(Pretty much confirmed)
4.RMM-GUV/TPTY...
more... VB can also happen.
Bridge Status: 92% of the new pamban Bridge works has been finished so far(Nov month Status).
Some local newspapers published that February 1st week as the deadline and the Inauguration will be made by PM shortly after that.(Already postponed several times in 2022 due to the unforeseen delays). Let's see what happens.
please wait...Translate to EnglishVande Bharat or Amrit Bharat? What's your preference with the Pamban Bridge opening ceremony and MDU-BNC VB?
I prefer:
1. RMM-SVDK SF via the mainline, TNM, TPTY, NDLS because these important pilgrimages don't have good connectivity.
2. RMM-CSMT/LTT TOD via the same mainline, TNM, TPTY.
3. MAQ-RMM SF (pretty much confirmed).
4. RMM-GUV/TPTY VB might happen too.
Bridge Status: 92% of the new Pamban Bridge works have been finished so far (as of November). Some local newspapers say it will be ready in the first week of February with the Prime Minister inaugurating it shortly after that. (There have been delays, so let's wait and see.)
please wait...Translate to HindiVande Bharat ya Amrit Bharat? Mujhe Pamban Bridge ki opening ceremony aur MDU-BNC VB ke saath kya pasand hai?
Mujhe pasand hai:
1. RMM-SVDK SF via Mainline, TNM, TPTY, NDLS kyunki yeh important tirth sthalon ki Rajdhani se judaav kam hai.
2. RMM-CSMT/LTT TOD via Same Mainline, TNM, TPTY.
3. MAQ-RMM SF (bahut hi confirmed).
4. RMM-GUV/TPTY VB bhi ho sakta hai.
Bridge Status: Naye Pamban Bridge ke 92% kaam ab tak ho chuka hai (Nov month status). Kuch local akhbaar ne February ke pehle hafta ko deadline aur PM ki inauguration ke baare mein likha hai (2022 mein kaafi baar postpone kiya gaya hai aniyamit deri ke kaaran). Dekhte hain kya hota hai.