Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 16 13:22:43 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5941445
Posted: Jan 13 (21:02)

No Responses Yet
Rail News
20810 views
0

Jan 13 (21:02)   Overpass Bridge Construction in Shamli Progressing at a Snail's Pace

scsharma1986   3207 news posts
Entry# 5941445   News Entry# 537438         Tags   Past Edits
उपरिगामी रेलवे पुल का धीमी गति से चल रहा निर्माण कार्य

The construction of the overpass bridge on the Delhi-Shamli, Saharanpur highway at the Jhandedi railway crossing is progressing slowly. The girders were placed on the bridge a year ago by the construction agency, but the work of laying the lintel has not been completed even after a year. The approach road...
more...
work is also incomplete. If the work continues at this pace, it will not be completed even in the next six months. The overpass bridge in Balwa, Jhandedi, and Rampur Maniharan in Saharanpur district is proposed on the Delhi-Shamli, Saharanpur highway. The construction of the Balwa overpass bridge is complete, but the approach road work is incomplete. Girders were placed a year ago to lay the lintel for the Jhandedi crossing overpass bridge on the border of Shamli-Saharanpur district. The work of laying the lintel is incomplete. The work of filling soil on the approach road has not been completed. Only two underpasses on the overpass bridge have been completed. The work of placing reinforcement bars to lay the lintel on the overpass bridge is to be completed. The construction of the Jhandedi overpass bridge will take more than six months to complete. In Rampur Maniharan in Saharanpur district, work is underway to demolish houses for the construction of the overpass bridge. The construction of the overpass bridge is expected to be completed by the end of this year. The GM of the highway construction agency, Jitendra Baliyan, has said that the approach road construction work for the Balwa overpass bridge will be completed in February. The Balwa bypass will be operational after February 15. The Jhandedi railway overpass bridge will be ready by June 30.

Delhi-Shamli, Saharanpur highway pe Jhandedi railway crossing pe overpass bridge ka construction kaam bahut slow chal raha hai. Construction agency ne ek saal pehle bridge pe girders rakh diye the, par ek saal baad bhi lintel daalne ka kaam pura nahi ho paya hai. Approach road ka kaam bhi adhoora pada...
more...
hua hai. Agar issi speed se kaam chalta raha to agle six months mein bhi kaam pura nahi ho payega. Delhi-Shamli, Saharanpur highway pe Balwa, Jhandedi, aur Saharanpur district ke Rampur Maniharan mein overpass bridge propose kiya gaya hai. Balwa overpass bridge ka construction pura ho chuka hai, par approach road ka kaam adhoora hai. Shamli-Saharanpur district ki border pe Jhandedi crossing overpass bridge ke lintel daalne ke liye ek saal pehle girders rakhe gaye the. Lintel daalne ka kaam adhoora hai. Approach road pe mitti daalne ka kaam pura nahi ho paya hai. Overpass bridge pe sirf do underpasses ka kaam pura ho paya hai. Overpass bridge pe lintel daalne ke liye sarिये daalne ka kaam pura hona hai. Jhandedi overpass bridge ka construction pura hone mein abhi six months se zyada time lagega. Saharanpur district ke Rampur Maniharan mein overpass bridge construction ke liye makaanon ko dhwast karne ka kaam chal raha hai. Overpass bridge ka construction is saal ke aakhir tak ban kar taiyaar hone ki ummeed hai. Highway construction agency ke GM Jitendra Baliyan ne bataya hai ki Balwa overpass bridge ki approach road construction ka kaam February mein pura ho jayega. 15 February ke baad Balwa bypass chaloo ho payega. Jhandedi railway overpass bridge 30 June tak taiyaar ho payega.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5968612 ★★★ 47ShivaankVaibhav~
6186110  15Rail_0326~
4948161 ★★★ 43SCoR~
3619297 ★★★ 399HBR^~
3368675 ★★★ 396mr.train_wala~
6007860 ★★★ 117RailwayFiles~
6186432 ★★★ 43PankajMishra^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy