Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 15 02:53:41 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5957944
Posted: Feb 01 (08:25)

1 Responses
Last Response: Feb 01 (15:24)
Rail News
34709 views
2

IR Affairs
NER/North Eastern
Feb 01 (08:25)   New Rail Route from Gorakhpur to Kathgodam to be Operational in March

AdittyaaSharma^~   73345 news posts
Entry# 5957944   News Entry# 539544         Tags   Past Edits
गोरखपुर से काठगोदाम सफर आसान, शुरू होगा नया रेल रूट, नई ट्रेन और फेरे बढ़ाने पर जल्द फैसला

A new rail route from Gorakhpur to Kathgodam will be operational starting March. The project involves converting the existing meter gauge line between Pilibhit and Shahgarh to broad gauge, which is almost complete (95% finished). This new route will provide an alternative path for passengers traveling to Kathgodam, reducing reliance on...
more...
other railway zones. Currently, there is only one train to Kathgodam, arriving from Kolkata, often fully booked, making it difficult for Gorakhpur passengers to secure seats. This new route, entirely within the jurisdiction of North Eastern Railway, will allow them to operate trains on their schedule. The new route will also reduce the dependence on Northern Railway for path allocation, as the current route passes through Bareilly, leading to capacity issues. The remaining work between Shahgarh and Pilibhit is in its final stages, with the CRS inspection already completed. The line is expected to be fully operational by February.

Gorakhpur se Kathgodam tak ek nayi rail route March se shuru hone wali hai. Pilibhit se Shahgarh tak 20 km meter gauge line ko broad gauge mein badalne ka 95% kaam pura ho gaya hai. Isse Kathgodam jaane walon ke liye ek aur route mil jaayega aur Northeast Railway ko dusre...
more...
zones par depend nahi karna padega. Kathgodam ke liye abhi sirf ek train hai, jo Kolkata se aati hai aur hamesha full hoti hai. Is wajah se Gorakhpur ke passengers ko seats nahi mil pati hai. Naya route, jo pura North East Railway ke control mein hai, unko apna time table banaane ki freedom dega. Isse Northern Railway ke sath path allocation ki problem bhi khatam hogi, kyunki abhi train Bareilly se jaati hai aur woh route busy hai. Shahgarh se Pilibhit tak ka kaam last stage mein hai, CRS inspection ho chuka hai, aur line February tak operational ho jaayegi.

Rail News
29034 views
1

Feb 01 (15:24)
PilibhitJunction^~
PilibhitJunction^~   2628 blog posts
Re# 5957944-1              
NER Sirf Sapne Hi Dikhata Hai Abhi Tk Overnight Train Delhi Ke Liye Nhi Chala Paya Hai Permanent
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6186110  12Rail_0326~
6186432 ★★★ 43PankajMishra^~
4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy