Feb 14 2024 (13:56) What distinguishes platforms 1 1- through from one another? Which Provide platforms a serve detailed as explanation termination of points? each platform and its route Provideadetailedexplanationforeachplatform
Feb 11 2024 (23:13) How are platforms platform determined assignments in decided at KSR Bengaluru? Platform What numbers distinguishes from platforms 1 to through 10 from one another? Which How platforms are serve they as different termination from points? eachother? Which Provide are a the detailed platforms explanation that for terminate? each platform Explaineachplatformindetailandit'sroute
Feb 11 2024 (23:11) How are platform platforms numbers in KSR Bengaluru? Platform numbers 1–10 from 1 to 10 Which are the platforms that terminate? Explain each platform in detail and it's route Pointwise
Feb 11 2024 (23:08) Explain each platform in detail and the direction station headed to Point wise
Feb 11 2024 (23:07) Platform numbers 1–7 1–10 and8–10 Does Which this platforms station terminate? haveapass-throughline?Ifso,whichone? Explain each platform in detail and the direction station headed to and the direction
Feb 11 2024 (15:06) Station Tag: KSR Bengaluru City Junction (Bangalore)/SBC added by PrakharYadav^~/622971
Feb 11 2024 (13:25) How are they different from each other? Which one has the longest and shortest platforms, as well as the capacity to accommodate a longer train? and the direction in which it is moving with its coach length
Feb 11 2024 (13:21) How are platform numbers selected determined in KSR Bengaluru? Platform numbers 1–7 and 8–10 Platform How numbers do 1–7 theyshortest 8–10 andcanaccommodatealongertrainlengthof24coaches?Doesthisstationhaveapassthroughlineofyeswhichone How are they different from each other? Which one has the longest and shortest platforms, as well as the capacity to accommodate a longer train? Describe Does each this platform station in have detail a pass-through line? If so, which one? Explain and each platform in which detail directionitisheadingwithitscoachlength and the direction in which it is moving with its coach length
Feb 11 2024 (13:20) How are platform members numbers selected in KSR Bengaluru? Platform numbers 1–7 and 8–10 How do they differ from one another? Which one of them has the longest platform and shortest and can accommodate a longer train length? length of 24 coaches ? Does this station have a pass through line of yes which one and in which direction it is heading with its coach length
How are platform assignments decided at KSR Bengaluru?
What distinguishes platforms 1- 10 from one another?
Provide a detailed explanation of each platform and its route.
चाकुलिया के पश्चिमी रेलवे फाटक के पास अंडरपास में जलजमाव जारी है। बारिश न होने पर भी अंडरपास में पानी भर जाता है, जिससे राहगीरों को परेशानी होती है। मंगलवार को एक पिकअप वैन का एक्सल टूटने से दुर्घटना... चाकुलिया...
देवघर, प्रतिनिधिमधुपुर अंतर्गत डालमिया न्यू ओवर ब्रिज के रेलवे पटरी संख्या- 280/22 से एक व्यक्ति का शव बरामद किया गया। मंगलवार को शव का पोस्टमार्टम देवघर,...
जसीडीह स्टेशन पर मंगलवार को टिकट जांच अभियान चलाया गया। रेलवे एक्ट के तहत 99 यात्रियों को पकड़ा गया और 21 हजार रुपए का जुर्माना वसूला गया। रेलवे मजिस्ट्रेट जूलन आनंद टोपयो के नेतृत्व में अभियान चलाया... जसीडीह...
मधुपुर में आरपीएफ ने धनबाद-पटना इंटरसिटी एक्सप्रेस ट्रेन से अवैध रूप से बिहार ले जाए जा रहे 36 केन बीयर जब्त किए। यह जानकारी यात्रियों द्वारा दी गई थी। बीयर की कीमत लगभग 4,000 रुपए है। मामले की जांच... मधुपुरप्रतिनिधि...
In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings.
1. All Red Ratings will require further explanation. Red Ratings won't...
As announced previously, there are a few changes coming to IRI user accounts, based on past practices.
1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
Followup to: Fmt Changes
The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging.
It...
There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED.
We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Important Note:This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks. Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.