रायपुर से गुजरने वाली कई ट्रेनें रद्द, 24 फरवरी से रहेगी प्रभावितThe Indian Railways has cancelled 13 express and passenger trains operating on the Mumbai-Howrah rail line from February 24th to March 6th due to construction work. These trains passing through Raipur will be affected for 12 days. This is the second time in a week that trains have been cancelled. Earlier,...
more... from February 18th to 26th, train operations were disrupted due to the construction of a third line connectivity at Ghunghutti station in the Anuppur-New Katni section under the Bilaspur Division of South East Central Railway for infrastructure development. Now, another 13 trains have been cancelled, bringing the total number of affected trains to 37. Some trains will operate on altered routes.
Mumbai-Howrah rail line pe construction ka kaam chalne ki wajah se, Railway ne 24 February se 6 March tak 13 express aur passenger trains ko cancel kar diya hai. Raipur se jaane wali yeh trains 12 din tak affected rahengi. Ye is hafte mein dusri baar hai jab trains cancel hui...
more... hain. Pehle, infrastructure development ke liye South East Central Railway Bilaspur Mandal ke andar Anuppur-New Katni section ke Ghunghutti station mein third line connectivity ka kaam chalne ki wajah se 18 February se trains ka operation band tha, jo 26 February tak raha. Ab, railway ne 13 aur trains ko cancel kar diya hai. Is tarah, total 37 trains affected hui hain. Kuchh trains change route se chalengi.