Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 14 01:57:28 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5984115
Posted: Mar 01 (21:42)

No Responses Yet
Rail News
3979 views
0

Metro
MMOPL/Mumbai Metro
Mar 01 (21:42)   Godrej Awarded Contract for Mumbai Metro Line 4 Station Finishing & PEB

Exynos9611~   19232 news posts
Entry# 5984115   News Entry# 543528         Tags   Past Edits
Godrej Declared as Lowest Bidder For Mumbai Metro Line 4’s Contract worth INR 251 Crores

Godrej & Boyce has been awarded the contract for station finishing and pre-engineered building (PEB) work on Mumbai Metro Line 4. The scope of the contract includes architectural finishing, plumbing, interior fit-outs, façade, and PEB for 7 elevated stations. The bid submitted by Godrej, though the lowest, was 24.99% higher than...
more...
MMRDA's estimated cost. The project is expected to undergo further negotiations before the Letter of Award (LoA) is issued. Mumbai Metro Line 4, also known as the Green Line, is a 32.32 km elevated line connecting Wadala to Kasarvadavali, passing through Chembur, Bhandup Mulund, and Teen Hath Naka in Thane. The project has an estimated cost of ₹14,549 crore.

Mumbai Metro Line 4 pe, station finishing aur PEB ka contract Godrej & Boyce ko mil gaya hai. Contract mein architectural finishing, plumbing, interior fit-out, facade aur 7 elevated stations ke liye PEB ka kaam shamil hai. Godrej ka bid, sabse kam hone ke baad bhi, MMRDA ke estimated...
more...
cost se 24.99% zyada hai. Project ko Letter of Award (LoA) issue hone se pehle, aur negotiation ki jarurat hai. Mumbai Metro Line 4, jo Green Line ke naam se jaani jati hai, 32.32 km ka elevated line hai, jo Wadala se Kasarvadavali tak jata hai, aur Chembur, Bhandup Mulund aur Thane ke Teen Hath Naka se hota hai. Project ka estimated cost ₹14,549 crore hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6186110  11Rail_0326~
5955786 ★★★ 51fanof12801~
6177596 ★★ 29KeepTravelling^~
6186432 ★★★ 41PankajMishra^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~
4307803 ★★★ 178AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy