Mumbai local train updates: Western Railway to operate night block between Borivali and Bhayander on SundayThe Western Railway announced a night block on the fast line between Borivali and Bhayander stations on the intervening night of Saturday/Sunday, March 9-10, 2024, for track, signaling, and overhead equipment maintenance. All fast line trains will run on the slow line between Virar/Vasai Road and Borivali during this block. There...
more... will be no block during the day on Sunday, March 10. Separately, the construction of the bullet train corridor has begun on the elevated section between Palghar and Thane districts in Maharashtra, covering 135 km. This segment includes 6 mountain tunnels, 36 crossings (11 steel bridges), and bridges over the Ulhas, Vaitarna, and Jagani rivers, with the Vaitarna River bridge being the longest at 2.32 km. The project features 3 elevated stations: Thane, Virar, and Boisar.
Western Railway ne Sunday, March 9-10 ki raat ko Borivali aur Bhayander stations ke beech fast line pe night block announce kiya hai. Is block ke during, track, signaling, aur overhead equipment ka maintenance kaam kiya jaayega. Iske wajah se, sabhi fast line trains Virar/Vasai Road se Borivali ke beech slow...
more... line pe chalenge. Sunday, March 10 ko din me koi bhi block nahi hoga. Iske alawa, Maharashtra ke Palghar aur Thane district ke beech elevated section me bullet train corridor ka construction shuru ho gaya hai. Ye section 135 km lamba hai aur isme 6 mountain tunnels, 36 crossings (jinme se 11 steel bridges hain), aur Ulhas, Vaitarna, aur Jagani rivers ke upar bridges hain. Vaitarna River pe bana bridge 2.32 km lamba hai aur yeh project ke sabse lamba bridge hai. Is project me 3 elevated stations hain: Thane, Virar, aur Boisar.