Nidadavolu in Rajahmundry Vijayawada section is undergoing a major revamp in yard and trains services may be cancelled even long distance in July 2024. A video is posted in Myway Railway 3 days back which shows new track being laid from NDD outer towards left ( Parallel to present down line towrads Vijayawada) of the present line which starts at NDD road flyover which starts 1 km from station and further branches into 2 lines. A retaining wall in built abutting Eluru Canal and big trees cut there and continue through Railway gate upto station with PF 4 foundation. Even the present up and down line may see some change in alignment. Please watch the video for better understanding