This CC is absolutely worse. Instead of reducing AC coaches they should have removed those two parcel vans and increased total no. of coaches to 22 by adding another SL and GS.
Why the hell does SWR want to cram 2 parcel vans in such a high in demand train. 3AC in this train was a hit always going full. There was no need to reduce 3AC also why the hell 4 GS and 2 EOG ?
It could have been 3 GS and 1 SLR and EOG each. This is a...
more... horrendous decision.
In the first place they stopped works on 22 LHB coach pitline at VSG for a year now it's almost 90% done but they don't complete it. Second they also don't want to increase the length of old pitline thirdly they run tons of freights including LHB parcel special because of which no new trains are introduced and finally even in existing high demand train like Goa express they cram 2 parcel vans reducing the already limited CC.