Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 14 13:14:26 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6017279
Posted: Apr 02 (21:13)

No Responses Yet
Rail News
3964 views
0

Metro
Apr 02 (21:13)   Kanpur Metro's Corridor-2 Construction Begins with Excavation of First Diaphragm Wall

Exynos9611~   19232 news posts
Entry# 6017279   News Entry# 546970         Tags   Past Edits
Kanpur Metro: Construction Work Begins For 3 Underground Stations

Construction has begun on the subterranean portion of Kanpur Metro's Corridor-2, which runs between CSA University and Barra-8. The first diaphragm wall (D-Wall) at Rawatpur underground station is being excavated, marking the next phase of development for this 4.1 km section. The segment will include three underground stations: Rawatpur, Kakadeo,...
more...
and Double Puliya. The Rawatpur station will be a key interchange station connecting the two metro corridors. The construction will use the 'Top-Down Method', starting from the roof slab and working downwards. This method minimizes traffic disruptions as the road barricades will be reduced after the first storey is built. The Kanpur Metro Rail Project is funded by the EIB, the central government, and the state government, with an estimated total cost of Rs. 11,076 crore. The first corridor is expected to be operational by November 2024, while the second corridor is expected to be operational in December 2025.

Kanpur Metro ke Corridor-2, jo ki CSA University aur Barra-8 ke beech mein hai, uske subterranean part ka construction shuru ho gaya hai. Rawatpur underground station pe pahla diaphragm wall (D-Wall) khudai ki jaa rahi hai, yeh is 4.1 km section ke development ka next phase hai. Is segment mein teen...
more...
underground stations honge: Rawatpur, Kakadeo, aur Double Puliya. Rawatpur station do metro corridors ko connect karne wala ek important interchange station hoga. Construction 'Top-Down Method' se kiya jaayega, jismein roof slab se shuru ho kar niche ki taraf kaam kiya jaayega. Is method se traffic mein disruption kam hota hai kyunki pahla storey banne ke baad road barricades kam ho jaate hain. Kanpur Metro Rail Project ko EIB, central government, aur state government fund kar rahe hain, iska estimated total cost Rs. 11,076 crore hai. First corridor November 2024 tak operational hone ki ummeed hai, aur second corridor December 2025 mein operational hone ki ummeed hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~
6186110  11Rail_0326~
5955786 ★★★ 51fanof12801~
6177596 ★★ 29KeepTravelling^~
6186432 ★★★ 41PankajMishra^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy