DBL Wins Package C-5 of the Haryana Orbital Rail CorridorDilip Buildcon Limited (DBL) has won the bid for Package C-5 of the Haryana Orbital Rail Corridor (HORC) project. The 21.14 km stretch, part of the 121.7 km corridor, was awarded to DBL for Rs. 1092.45 crore. The HORC project aims to create a semi-high-speed rail line in Haryana, connecting Palwal...
more... to Sonipat via Sohna, Manesar, and Kharkhouda. Package C-5 includes a 3.9 km viaduct near the Aravalis, an at-grade section, and the construction of three stations: IMT Sohna, Silani, and New Prithala.
Dilip Buildcon Limited (DBL) ne Haryana Orbital Rail Corridor (HORC) project ke Package C-5 ka bid jeet liya hai. 21.14 km ka yeh stretch, 121.7 km corridor ka ek hissa hai, DBL ko Rs. 1092.45 crore mein diya gaya hai. HORC project ka maqsad Haryana mein ek semi-high-speed rail line banaana...
more... hai, jo Palwal ko Sohna, Manesar, aur Kharkhouda ke raaste Sonipat se jodta hai. Package C-5 mein Aravalis ke paas 3.9 km ka viaduct, ek at-grade section, aur teen stations ka construction shamil hai: IMT Sohna, Silani, aur New Prithala.