It means that the 6th Line at Malad Station will be laid on the West Side instead of the East side as elsewhere, so the new line at Malad station will become the New Down Slow line, by cutting lines at both Malad North & South.
Also, Upcoming Harbour line will be made Elevated at Malad as west side lans would be already used for 6th Line along with Platform for the same.