Kolkata Metro update: Authorities conduct trial runs on extended Orange line from Ruby Crossing to Beleghata – Details insideKolkata's Orange Line metro has been extended by 4.39 kilometers, connecting Hemanta Mukhopadhyay station in the south to Beleghata in the north. Trial runs were conducted on the new stretch between Ruby Crossing and Beleghata, testing various parameters like track condition, brakes, power supply, and station staff responsiveness. The extension allows...
more... passengers to interchange between the Blue Line and Orange Line at Kavi Subhash station. The Commissioner of Railway Safety has recommended infrastructure improvements for the new section.
Kolkata ka Orange Line metro 4.39 kilometer tak bada diya gaya hai, jisme Hemanta Mukhopadhyay station south mein aur Beleghata north mein connect hota hai. Ruby Crossing se Beleghata tak new stretch pe trial runs kiye gaye, jisme track condition, brakes, power supply, aur station staff ki response check ki gayi....
more... Is extension se passengers ab Kavi Subhash station pe Blue Line aur Orange Line ke beech interchange kar sakte hain. Commissioner of Railway Safety ne new section ke liye infrastructure improvements ke suggestions diye hain.