Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 8 23:34:02 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6055423
Posted: May 06 (21:03)

No Responses Yet
Rail News
2084 views
0

Metro
MMOPL/Mumbai Metro
May 06 (21:03)   Mumbai Metro's First Underground Line Nears Completion, Trial Runs to Extend to Worli

Exynos9611~   18807 news posts
Entry# 6055423   News Entry# 551217         Tags   Past Edits
read full article... मेट्रो लवकरच बीकेसीऐवजी वरळीपर्यंत धावणार दादर स्टेशन : प्लॅटफॉर्म 10वरून लवकरच दोन्ही बाजूने चढता-उतरता येणार आता प्लॅटफॉर्मवर उभं राहूनही काढता येणार तिकिट

The Mumbai Metro Rail Corporation (MSRC) is preparing to commence trial runs for the second phase of Mumbai's first underground metro. The trials, initially planned for BKC, are now scheduled to extend to Worli within the next few weeks. Track laying to Worli has been completed, and installation of...
more...
other equipment is nearing completion. Integrated testing of Metro-3 between Aarey and BKC has been ongoing since late last year. All necessary permissions for commencing the first phase of service are expected within the next two months. The trial runs between Aarey and BKC are in their final stages, currently involving the testing of the trains and tracks using weighted loads. These tests are conducted at speeds of 95 kilometers per hour, ensuring all systems are functioning correctly. In addition to train operations, the signaling system, telecommunications, platform screen doors, and tracks are also undergoing testing. Third-party inspections of the metro line will be conducted soon, followed by an invitation to the Commissioner of Railway Safety (CSRS) for final testing. Following the completion of the first phase, the MSRC has accelerated work on the second phase. Nine trains are planned for the initial service, with all having undergone testing. An additional eleven trains have arrived in Mumbai for the second phase, and their testing is also underway. The underground metro line connecting Aarey and Colaba is nearing completion, with tunneling and track laying almost finished. Equipment installation is ongoing, and the project is approximately 95% complete. The MSRC plans to launch the service in three phases. The first phase will cover Aarey to BKC, the second phase will cover BKC to Worli, and the third phase will cover Worli to Colaba. Service in the first phase is expected to begin by July, while full service along the entire line is anticipated by the end of 2024 or the beginning of 2025.

Mumbai Metro Rail Corporation (MSRC) Mumbai ke pehle underground metro ke dusre phase ke trial run shuru karne ki taiyari kar raha hai. Trials pehle BKC tak karne ki plan thi, lekin ab ye next few weeks mein Worli tak extend karne wala hai. Worli tak track lagane ka...
more...
kaam pura ho chuka hai aur saare equipment install karne ka kaam bhi almost pura hone wala hai. Aarey aur BKC ke beech Metro-3 ki integrated testing last year ke end se chal rahi hai. First phase ki service shuru karne ke liye saari permissions next do months mein milne ki ummid hai. Aarey aur BKC ke beech trial runs apne final stage mein hain, jismein ab weight loads laga kar trains aur tracks test kiye ja rahe hain. Yeh tests 95 kilometers per hour ki speed pe kiye ja rahe hain, aur yeh ensure kiya ja raha hai ki saare systems sahi se kaam kar rahe hain. Train operation ke saath saath, signaling system, telecommunications, platform screen doors aur tracks ka bhi testing chal raha hai. Metro line ka third-party inspection bhi jaldi hone wala hai, aur iske baad Commissioner of Railway Safety (CSRS) ko final testing ke liye invite kiya jaega. First phase ke kaam ke pura hone ke baad, MSRC ne dusre phase ke kaam mein tezi laai hai. Initial service mein 9 trains chalane ki plan hai, aur in sabhi ka testing pura ho chuka hai. Dusre phase ke liye alag se eleven trains Mumbai mein aa chuki hain, aur unka bhi testing shuru kiya ja chuka hai. Aarey aur Colaba ko connect karne wali underground metro almost complete ho chuki hai, tunneling aur track laying ka kaam almost pura ho chuka hai. Equipment install karne ka kaam chal raha hai, aur project almost 95% complete ho chuka hai. MSRC ki plan hai ki service teen phases mein shuru ki jaaye. First phase mein Aarey se BKC, dusre phase mein BKC se Worli aur teesre phase mein Worli se Colaba tak service shuru ki jaayegi. First phase ki service July tak shuru hone ki ummid hai, aur pura line pe service 2024 ke end ya 2025 ke starting mein shuru hone ki ummid hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy