Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 14 04:14:33 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6071666
Posted: May 21 (12:19)

No Responses Yet
Rail News
11981 views
0

IR Affairs
NCR/North Central
May 21 (12:19)   Gwalior Railway Station Redevelopment Project Facing Delays, Deadline Extended

AdittyaaSharma^~   73345 news posts
Entry# 6071666   News Entry# 553089         Tags   Past Edits
Gwalior Station redevelopment: स्टेशन पुनर्विकास का काम लेट, मार्च 2025 की समय सीमा, फिर भी लेना पड़ेगा एक्सटेंशन

The redevelopment project of Gwalior Railway Station, costing ₹500 crore, is facing delays. The project was initially scheduled to be completed by December 2024, but only 35% of the work has been completed. The deadline has been extended by three months to March 2025, but further extensions might be required....
more...
The Hyderabad-based company KPC Infra has been instructed to accelerate the work. To facilitate the shifting of railway offices, two multi-story buildings have been constructed near platforms 1 and 4, which will be ready by the end of May. The offices will be moved to these buildings in June, allowing for demolition work to begin. The current work involves cutting the existing roof to replace it with a pre-fabricated steel roof. The foundations for the new roof are already complete, and the fabrication of the roof itself is underway in Delhi. The project commenced in December 2022, and the initial completion deadline was 24 months. Despite the three-month extension, it seems unlikely that the project will be completed on time. Deputy Chief Engineer of North Central Railway, Akash Yadav, stated that they aim to finish the building work by March 2025. However, the construction of the station building is the priority, and other tasks like installation of lifts, escalators, and beautification of the circulating area might take longer. The project includes the construction of two new platforms, increasing the total number of platforms to six. This requires the relocation of the reservation office, circulating area, and GRP station from platform 4 to accommodate the new platforms. The laying of tracks on the new platforms will also necessitate testing, potentially leading to a further extension of the project deadline.

Gwalior Railway Station ka 500 crore ka redevelopment project bahut slow chal raha hai. December 2024 tak khatam hona tha, lekin abhi sirf 35% kaam ho paya hai. Deadline 3 mahine badha kar March 2025 kar diya gaya hai, lekin phir bhi extension ki zarurat pad sakti hai. Hyderabad ki company...
more...
KPC Infra ko kaam tez karne ka order diya gaya hai. Station ke offices ko shift karne ke liye platform 1 aur 4 ke paas do multi-story building ban gayi hain, jo May ke end tak ready ho jaayengi. June me offices ko inme shift kiya jaayega aur station ki building todne ka kaam shuru ho jaayega. Abhi station ki chat ko cut karke usko pre-fabricated steel roof se replace kiya ja raha hai. New roof ki foundation already complete hai aur roof ka fabrication Delhi me chal raha hai. December 2022 me project start hua tha, aur 24 mahine me khatam hona tha. 3 mahine ka extension ho chuka hai, par phir bhi time pe khatam hona mushkil lag raha hai. North Central Railway ke Deputy Chief Engineer Akash Yadav ne bataya ki March 2025 tak building ka kaam khatam karne ka target hai. March tak sirf building ka kaam khatam hoga, baaki kaam baad me honge, lekin woh bhi mushkil hai. Station me zyada tar construction pre-fabricated hai, jisme technical testing bahut zaroori hai. Jaise 21 lifts aur 19 escalators lagne hain. Inhe install karne ke baad unka trial karne me bhi time lagega. Circulating area ko behtar banane aur parking ka kaam bhi karna hai, jisme bhi mahino lag jaayenge. Project me 2 new platforms bhi banaye jaa rahe hain, jisse platforms ki sankhya 6 ho jaayegi. Iske liye platform 4 ke paas reservation office, circulating area aur GRP station ko hataana padega. Platforms ready hone ke baad tracks bhi bhichane honge, jisko testing ki bhi zarurat hai. Is wajah se project ki deadline phir se badhaani pad sakti hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6186110  11Rail_0326~
5955786 ★★★ 51fanof12801~
6177596 ★★ 29KeepTravelling^~
6186432 ★★★ 41PankajMishra^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~
4307803 ★★★ 178AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy