जुलाई से आदित्यपुर में शुरू होगी नए आरआरआई से ट्रेनों की मॉनिटरिंगA new RRI (Route Relay Interlocking) system is being installed at Adityapur station, which is expected to be operational by July. The new RRI system will improve train operations. The new RRI system at Tatanagar station is expected to be monitored from November or December. The RRI is being installed as...
more... part of the third line construction project, which involves changes to both Adityapur and Tatanagar stations. The new RRI system at Adityapur is being designed to ensure safe operations. The RRI at Tatanagar will be updated after the Adityapur system is operational, as the third line construction is currently underway from Adityapur yard to Tatanagar station to Salgajhari West Cabin. Before the new RRI systems are operational at Tatanagar and Adityapur, changes need to be made to the diamond point in the Chakradharpur division to enable trains to switch between tracks.
Adityapur station pe July tak naya RRI system (Route Relay Interlocking) shuru ho sakta hai, jisse trains ke chalane me suvidha hogi. Ab Adityapur station ke new RRI me panel, signal aur point sahit dusre system lagane me operation aur signal vibhag ke kamdar lage hue hain. Dusri taraf, Tatanagar ke...
more... new RRI se trains ki monitoring November aur December se shuru hone ki umeed hai. Third line bichane ke liye RVNL (Rail Vikas Nigam Limited) ne Tatanagar aur Adityapur station ke aas paas kai tareeke se badlav kiya hai. Isse loop line bichane ke saath tod-fod ki, lekin dono stations pe naya RRI system bana ke diya hai. Is taraf, Rail GM aur DRM ke nishpekkshan me kai baar dono stations ki RRI ko shuru karne ka aadesh hua. Surakshit chalane ki yojana se Adityapur station pe naya automatic RRI taiyar kiya ja raha hai. Iske baad hi Tatanagar me RRI update hoga, kyunki abhi Adityapur yard se Tatanagar station hokar Salgajhari West Cabin tak third line bichane ka kaam chal raha hai. Bataya jata hai ki Tatanagar aur Adityapur station me naya RRI (Route Relay Interlocking) shuru karne se pehle Chakradharpur mandal ko diamond point ki sthiti me badlav karna hoga, jisse trains ek se dusri line par ja sake.