Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 29 05:27:23 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6076643
Posted: May 26 (21:28)

3 Responses
Last Response: May 27 (21:24)
Rail News
14024 views
4

IR Affairs
WCR/West Central
May 26 (21:28)   High-Speed Rail Project To Upgrade Itarsi-Manikpur Line

Exynos9611~   20150 news posts
Entry# 6076643         Tags   Past Edits
1 compliments
Useful
इटारसी से मानिकपुर तक बनेगा 520 किमी लंबा हाई स्पीड ट्रैक

The Western Central Railway zone has completed around 75% of the Mumbai-Delhi high-speed track passing through the Kota division. Now, efforts are being made to upgrade the Itarsi-Manikpur line via Jabalpur, Katni, and Satna to a high-speed track. This will involve building compound walls and fencing on both sides of the...
more...
track, enabling trains to run at 160 km per hour. The General Manager of the Western Central Railway, Shobhana Bandopadhyay, has indicated this plan, emphasizing the focus on developing railway infrastructure, including track expansion, doubling, and tripling projects, along with other passenger amenities. The project also includes a grade separator above Katni station, the first of its kind in India, aimed at reducing travel time for freight and enabling uninterrupted travel for 16 km. This project covers a total distance of 520 km between Itarsi and Manikpur, with track doubling being prioritized near Ghat Pinderai in Narsinghpur and near the Tawa River. The entire track will be fenced on both sides to prevent animal intrusion and ensure smooth train movement. The Kota division has already implemented similar fencing measures along a 585 km stretch, covering 1170 km in total. This involved three types of fencing: concrete walls for 100 km, wire fencing with CC pillars for 300 km, and cement sheet fencing with CC pillars for the remaining portion. The project cost is estimated at INR 1 billion. Shobhana Bandopadhyay highlighted the importance of making the Itarsi-Manikpur track a high-speed track for trains to operate at 160 km per hour, and this will involve covering both sides of the track, similar to the Kota division.

Western Central Railway zone ne Kota division se jaane wala Mumbai-Delhi high-speed track ka kaam karieb 75% complete kar liya hai. Ab Itarsi se Jabalpur, Katni, aur Satna se hota hua Manikpur line ko bhi high speed track banaane ke efforts shuru kar diye gaye hain. Iske liye track ke dono...
more...
taraf compound walls aur fencing ki jaayegi, jisse is track par bhi 160 km per hour ki speed se trains chal payengi. Western Central Railway ke General Manager, Shobhana Bandopadhyay ne yeh baat batayi hai, aur unhone railway infrastructure ko develop karne par focus diya hai, jisme track ka extension, doubling, aur tripling projects, aur saath hi saath aur passenger facilities bhi shamil hain. Is project mein Katni station ke upar se guzarne wala grade separator bhi hai, jo ki India ka pehla grade separator hai, jiska maksad freight ka travel time kam karna aur 16 km ka safar bina rukne ke direct karana hai. Yeh project Itarsi aur Manikpur ke beech 520 km ki total distance ko cover karta hai, aur track doubling Narsinghpur ke paas Ghat Pinderai aur Tawa River ke paas fast pace pe chal raha hai. Pure track ko dono taraf se boundary wall fencing ki jaayegi, jisse rail track par animals na aa paye aur trains apni speed se chal sake. Kota division ne pehle hi 585 km ke stretch par aisa hi fencing ka kaam complete kar liya hai, jiska total length 1170 km hai. Isme three types ki fencing ki gayi hai: 100 km concrete walls, 300 km wire fencing with CC pillars, aur baki hisse mein CC pillars pe cement sheet fencing. Is project ki lagat INR 1 billion ke karib hai. Shobhana Bandopadhyay ne bataya hai ki Itarsi-Manikpur track ko high-speed track banana unki priority hai, taki trains 160 km per hour ki speed se chal sake. Iske liye Kota division ki tarah track ke dono taraf ko cover kiya jaayega.

Rail News
8087 views
0

May 27 (20:36)
Balgobind Mishra~   1866 blog posts
Re# 6076643-1              
Ajeeb hai bhai....
Pahle isko 130 MPS pe to karo... Sidhe 160 ya 200 mps ki baat hoti hai...
Translate to English
Translate to Hindi

7545 views
2

May 27 (21:21)
PrakharWCR
PrakharWCR   183 blog posts
Re# 6076643-2              
130 ho nahi raha 160 karenge.
Translate to English
Translate to Hindi

6585 views
0

May 27 (21:24)
Exynos9611~
Exynos9611~   24767 blog posts
Re# 6076643-4              
chalo ye bhi acha h
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5383447 ★★★ 144jishnuthakur12301^...
3247625 ★★★ 134~
2308508 ★★★ 38Yantravinyas
3368675 ★★★ 397mr.train_wala~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy